Run Integration Testing in a Production Environment
Updated on 21.10.2026
0%
Table of Contents
- +Introduction to project management
- Definition of key terms
- What goes into integration testing
- Acceptance test: four forms of acceptance and two branches
- The testing flow: from acceptance criteria to the recommendation
- Results reports: integration tests and user testing
- Test coverage: what remained unchecked
- Defects: logging, triage and a decision on each one
- Equipment branch: factory, site, commissioning
- Service Acceptance Criteria and user-testing sign-off
- The “release / do not release” recommendation
- What comes next: from a verified result to documentation
- Conclusion
- How to do it
- Tailoring
- Practice
